We do not have to dig a lot because we’re keeping most of the original shape of the land. It flows beautifully towards the river 60 meters down. But because we’re using a stone foundation (earthquake proof) we do need some more excavating. Also building the bouwplank for the main house. With the bouwplank they can zone the area and tie up some lines to make sure all is straight and correctly measured. And also we got power! The PLN guy came and installed a temporary PLN-box on the farmers cabin of our friendly neighbour. (Who is a bit overwhelmed with everything that is starting now but we had some good talks. He is also a close relative to the landowners family.)